Rockford & McPhedrons Road Water Treatment Plant Upgrades

Client:

Waimakariri District Council

Consultant:

Waimakariri District Council

Contract:

$150,000

Duration:

March 2024 – April 2024

Services:

Civil Engineering
Mechanical
 Water Treatment
Precast and Insitu Concrete

Project Management

Brief:

Installation of two client supplied backup generators on insitu concrete slabs with associated ducting and civil works. Installation of principal supplied UV reactors, valving, flow meters, SS pipework, UVT analyser and flow control units.

Scope:

Project Works:

- Minor earthworks and basecourse for slab foundations

- Pour generator slabs with electrical duct penetrations

- Install supplied generators

- Design and build new generator housings

- Water supply shutdown

- Removal of existing pipework and valving

- Install new actuated butterfly valves, dismantling joints and flow meters.

- Install new UV reactors, control panels and cabling

- All new SS pipework and static mixer

- Building reconfiguration and relocation of dosing and monitoring points.

- Testing and Commissioning